Thursday, December 22, 2011

December 20th progress




I got 2 sections of ramp done as of the 22nd of December and I only have one section left to do. I am 2 feet from the top of the concrete slab so now I can get up without a ladder now-- sort of a big step though. usually winter starts here on the first of december but we have had mild weather so far all month.

Video of installation of brackets that hold ramp. Jose took the movies-- he dropped in while I was working.
1. putting in nails to bracket    <iframe width="1280" height="720" src="http://www.youtube.com/embed/ncVWRG19WkM" frameborder="0" allowfullscreen></iframe>
2.  Screws to bracket    http://youtu.be/gAQz9BYKZD4

No comments:

Post a Comment